Studies & Plans

Environmental assessments, engineering studies and designs

Major municipal construction projects are sometimes preceded by a pre-engineering study or an environmental assessment study.

Recently completed traffic engineering studies

Recently completed environmental assessment studies

Environmental assessment studies scheduled to begin or currently underway 

Detailed design projects scheduled to begin or currently underway 

  • Fourth Line - Speers Road to South Service Road W.
  • Speers Road - Third Line to Fourth Line 
  • Lower Base Line design (coordinated with the Town of Milton)  
  • Mid-Town Core road network improvements 
  • Iroquois Shore Road improvements with a new connection to Royal Windsor Drive 
  • North Service Road improvements with a new connection to Ford Drive 
  • South Service Road improvements (Industry Street to Royal Windsor Drive) 
  • QEW and Royal Windsor Drive exit ramp improvements

Projects coordinated with the Halton Region

Visit the Halton Region website for more details.

  • New North Oakville Transportation Corridor and crossing of Sixteen Mile Creek 
  • Trafalgar Road improvements (Leighland Avenue/Iroquois Shore Road to Upper Middle Road) 
  • Dundas Street improvements (Oak Park Boulevard to East of Highway 403) 
  • Neyagawa Boulevard improvements (Dundas Street to Highway 407)
  • Dundas Street improvements (Neyagawa Boulevard to Oak Park Boulevard) 
  • Ninth Line improvements (Dundas Street to Upper Middle Road) 
  • Upper Middle Road (Postmaster Drive to west of Bronte Road)

Noise studies and noise attenuation programs 

Engineering and Construction 10-year capital forecast 

For more information contact:

Engineering and Construction
905-845-6601, ext. 3398 or 3302 
serviceoakville@oakville.ca