Studies & Plans
Environmental assessments, engineering studies and designs
Major municipal construction projects are sometimes preceded by a pre-engineering study or an environmental assessment study.
Recently completed traffic engineering studies
- Oakville Trafalgar Memorial Hospital On-street Parking Report
- 2010 Oakville Road System Report (3.95 MB)
Recently completed environmental assessment studies
- Third Line extension North of Dundas Street
- Fourth Line Class Environmental Assessment (Speers Road to North Service Road)
- Speers Road Environmental Assessment Study (Bronte Road to Kerr Street)
Environmental assessment studies scheduled to begin or currently underway
- Sixth Line Class Environmental Assessment – Dundas Street to New Burnhamthorpe Road
Detailed design projects scheduled to begin or currently underway
- Fourth Line - Speers Road to South Service Road W.
- Speers Road - Third Line to Fourth Line
- Lower Base Line design (coordinated with the Town of Milton)
- Mid-Town Core road network improvements
- Iroquois Shore Road improvements with a new connection to Royal Windsor Drive
- North Service Road improvements with a new connection to Ford Drive
- South Service Road improvements (Industry Street to Royal Windsor Drive)
- QEW and Royal Windsor Drive exit ramp improvements
Projects coordinated with the Halton Region
Visit the Halton Region website for more details.
- New North Oakville Transportation Corridor and crossing of Sixteen Mile Creek
- Trafalgar Road improvements (Leighland Avenue/Iroquois Shore Road to Upper Middle Road)
- Dundas Street improvements (Oak Park Boulevard to East of Highway 403)
- Neyagawa Boulevard improvements (Dundas Street to Highway 407)
- Dundas Street improvements (Neyagawa Boulevard to Oak Park Boulevard)
- Ninth Line improvements (Dundas Street to Upper Middle Road)
- Upper Middle Road (Postmaster Drive to west of Bronte Road)
Noise studies and noise attenuation programs
- Vehicular Traffic Noise – Presentation made at May 22, 2007 Council meeting (pdf, 2.2 MB)
- Town of Oakville Noise Attenuation Wall Retrofit Policy (pdf, 430 kB)
- Noisewalls – Region of Halton Noise Abatement Program
Engineering and Construction 10-year capital forecast
For more information contact:
Engineering and Construction
905-845-6601, ext. 3398 or 3302
serviceoakville@oakville.ca
