Motorists are reminded that extra caution is required when driving through construction areas.
The following projects are scheduled to commence or are currently underwary:
- Annual Surface Treatment Conversion Program
- Annual Hot Mix Asphalt Resurfacing Program
- Roads approved for the 2010 hot mix program (pdf, 32 kB)
- Road resurfacing and rehabilitation (background, 2010 budget and road selection process)
- Glen Oak Drive Storm Sewer Construction and Wildwood Drive Culvert Replacement (pdf, 800 kB)
- Navy Street to First Street
- Reconstruction of roadways and intersections
- The intersection of Fourth Line and North Service Road (joint contract with the Ministry of Transportation)
- North Service Road between QEW and Town Centre II
- Third Line improvements (Rebecca Street to Lakeshore Road)
- Lakeshore Road improvements (Burloak Drive to Great Lakes Boulevard)
- Reconstruction of Dundas Street from Proudfoot Trail to Neyagawa Boulevard (Region of Halton project)
- QEW Widening and Improvements through Oakville - Burloak Drive to Trafalgar Road (pdf, 84 kB)
- Reconstruction of bridges
- Fourth Line Bridge at QEW (joint contract with the Ministry of Transportation)
- Lakeshore Road West at Sheldon Creek
- Dundas Street at Sixteen Mile Creek (Region of Halton project)
Upcoming projects:
- Reconstruction of bridges
- Shepherd Road Bridge over Speers Road
- Lower Base Line Bridge over Sixteen Mile Creek (Coordinated with the Town of Milton)
- Reconstruction of roadways and intersections
- Cornwall Road between Maple Grove Drive and Winston churchill Boulevard
- Ford Drive between Constance Drive and Cornwall Road
- Lakeshore Road between Great Lakes Boulevard to Mississaga Street
For more information on any of the above projects, please contact the Department of Engineering and Construction at 905-845-6601, ext. 3398 or publicworks@oakville.ca.
