Speers Road Widening and York Street/Wallace Road Reconstruction

Speers Road Widening - Third Line to Fourth Line

The town will be widening and reconstructing Speers Road to five lanes (four through lanes and a centre turning) with separated on-road bike lanes from Third Line to Fourth Line.

Project Highlights

  • Widened road platform
  • Asphalt resurfacing
  • New concrete curb and gutter
  • Separated on-road bike lanes
  • Driveway restoration
  • 14 Mile Creek bridge widening and rehabilitation
  • New sidewalks
  • Upgraded street lighting
  • New traffic signals at Third Line and Fourth Line intersections
  • Two new pedestrian crossings
  • Grading and top soil and sod restoration.

Project Scheduling and Staging

Pending the completion of design, permitting, tendering and project award, construction for the road widening work will commence in summer 2019 and will be substantially completed November 2020.

The relocation of utilities began in summer 2018 and the replacement of the watermain on Speers Road will begin summer 2019.  The limits of the watermain work extend west of Third Line to Fourth Line.

York Street and Wallace Road Reconstruction

The Town will be reconstructing York Street and Wallace Road to a fully urbanized roadway.

Project Highlights

  • Asphalt Resurfacing
  • New concrete curb and gutter
  • Driveway Restoration
  • Grading and boulevard restoration

Project Scheduling

Pending the completion of design, tendering and project award, construction for the road reconstruction will commence in spring 2020.

Public Information Centre

The Engineering and Construction Department held a public information centre on June 20, 2018.

Review the notice and materials presented at the meeting:

Presentation material (pdf)
Proposed Speers Road Widening Drawings (pdf)
Proposed York and Wallace Reconstruction Drawings (pdf)

For more information

Kasia Piskorz
Project Leader - Capital Projects
Engineering & Construction
905-845-6601, ext. 3533
kasia.piskorz@oakville.ca

Ross Zhang
Project Leader - Capital Projects
Engineering & Construction
905-845-6601, ext. 3398
ross.zhang@oakville.ca