Public information centre on March 9, 2016 for widening of a portion of Cornwall Road

Fri, 26 Feb 2016

Wednesday, March 9, 2016 — 6 to 8 p.m.
Oakville Town Hall
Acorn Grill Cafeteria
1225 Trafalgar Road Oakville L6H 0H3

Your Input is Important!

The Town of Oakville appreciates your feedback and we encourage you to get involved.

The town is in the process of completing detailed design drawings for the widening and resurfacing of Cornwall Road from Chartwell Road to Morrison Road. Pending the completion of design, tendering and project award, construction is scheduled to begin in early summer of 2016 and will be substantially complete in December, 2016.

Project highlights include:

  • Widening of the existing road platform to include two lanes in each direction
  • Addition of a landscaped planted median island
  • Upgrade of the existing signals at Morrison Road and Chartwell
  • Road
  • Existing street lighting will be upgraded to LED lighting
  • Construction of pedestrian facilities including an asphalt multi-use pathway and a concrete sidewalk
  • Existing vegetated berms along Cornwall Road and the rail corridor will NOT be impacted.
  • Tree plantings will be included along the roadway after construction is completed. Plantings will be done by the Town of Oakville forest Department.
  • The Project also includes pathway improvements behind the Town of Oakville Operations Depot as well as tree plantings along the pathway.
  • The existing culverts on Cornwall Road and Morrison Road at Wedgewood Creek will be replaced.
  • Traffic will be maintained including one lane in each direction for the duration of the project

The meeting is a drop-in format and does not provide for a formal presentation. Residents are encouraged to drop by any time during the two hours.

If you are unable to attend the public meeting or wish to review the material in advance of the meeting, additional information will be available on the town’s website on Wednesday, March 2, 2016.

For more information regarding this project, please visit the Cornwall Road Reconstruction and Widening page.

If you have any questions or cannot attend but would like to provide comments, please contact the project manager by Friday March 25, 2016.

Project Contact:

Adam Kiley, P. Eng
Project Leader, Capital Projects
Engineering and Construction Department
905-845-6601, Ext. 3357
Adam.kiley@oakville.ca