About the project
The Town of Oakville has initiated a detailed design to replace and upsize McCraney Creek bridge, near 602 Lakeshore Road West. Construction is planned for 2027.
The project will undergo stormwater management improvements to address drainage concerns per the McCraney Creek Bridge Replacement Environmental Assessment. Visit the McCraney Creek Bridge Replacement Environmental Assessment page for details of the class EA environmental assessment study for the replacement of the McCraney Creek bridge.
A road closure along Lakeshore Road will be required (up to 60 days) to facilitate construction of the culvert, which will include shifting traffic from Lakeshore Road to a detour route while the culvert is being constructed. In fall and winter of 2026, residents can expect traffic disruptions including reduced lanes to facilitate utility relocations.
Project location
The culvert replacement is 80 metres north of Fourth Line along Lakeshore Road, and works will extend 50 metres west along McCraney Creek for necessary creek alignments.
Project timeline
Detailed design work is currently underway.
- 2025 to 2027 – Detail design and tender works
- Detailed design completion - December 2026
- Tender - February 2027
- 2026 to 2027
- Utility relocations are anticipated for fall of 2026 into 2027 during construction.
- Tree clearing is anticipated for fall of 2026
- Construction of culvert, road resurfacing anticipated to start in spring of 2027 and complete by the end of 2027
Contact
Katie Haines
Project Leader, Capital Projects
905-845-6601 ext.3398
-
- Roads, Bridges & Storm Sewers
- Bridge Road Reconstruction
- Burloak Drive Grade Separation
- Burnhamthorpe Road East Urbanization
- Burnhamthorpe Road Rehabilitation
- Culvert Rehabilitation Near 1296 Lakeshore Road West
- Drainage Improvements - Lakeshore Road West to Burnet Street
- Kerr Street Grade Separation
- Marine Drive Traffic Calming Measures and Road Resurfacing
- McCraney Creek Bridge Replacement
- Morrison Road Culvert Replacement
- Royal Windsor Drive Bridge Rehabilitation
- Saville-Seaton Area Storm Drainage Improvement Project
- Sixth Line Widening
- Speers Road Widening
- St. Jude's Cemetery Culvert Replacement
- Trafalgar Lawn Cemetery Culvert Replacement
- Westminster Drive Storm Sewer and Road Resurfacing
- Woodhaven Park Drive Storm Sewer and Road Resurfacing
- Wyecroft Road Widening and Active Transportation - Bronte Road to Third Line
- York Street and Wallace Road Reconstruction
- Pedestrian Crossover and Intersection Improvement Projects
- Stream & Shoreline Projects
- Traffic Calming Projects