About the project

The Town of Oakville is advancing work to replace an aging stormwater culvert located beneath the roadway within St. Jude’s Cemetery. The existing 135 metre corrugated steel pipe has reached the end of its service life and requires replacement to ensure the continued safe conveyance of stormwater through the area. The work will include

  • Replacement of the existing CSP culvert with a new high density polyethylene (HDPE) pipe of equivalent size and function
  • Installation of new headwalls with safety grates at the inlet and outlet
  • Reconstruction and repaving of the cemetery roadway above the culvert

Project status 

Construction is currently underway and is progressing well. 

Phase 1 is expected to conclude in December of 2026 (weather permitting). Upon completion of Phase 1, the roadway will reopen and vehicle access will be restored. 

Phase 2 will consist of a shorter closure expected in the Spring of 2027 to complete final roadway paving.

What to expect during construction

St Jude's Cemetery remains open during construction.

  • Interments, visitations, and cemetery services will continue
  • Portions of the cemetery driveway are temporarily closed to vehicles
  • Regular construction hours are Monday to Friday, 7 a.m. to 5:30 p.m.

Please review the map showing the temporary pedestrian entrances and designated visitor parking area.