Bridges, Stairs and Boardwalk replacements

About this project

As a part of an annual rehabilitation program, the Parks and Open Space Department has had inspections of all bridge and stair structures conducted to determine any required works.   

The structures included in this current project were identified as requiring replacement, mostly because they did not meet current Town standards or were at the end of their design life.   

Along with structural replacements, sections of trails and landscaping may be updated or upgraded simultaneously. 

Phase 3: In progress

Work for Phase 3 was tendered in spring 2025 with anticipated completion by December 2025. The sites and their respective works in Phase 3 include:

Arbourview Park

Two pedestrian bridges will be replaced starting August 27, 2025. Anticipated completion by end of October 2025, weather permitting.

Sixteen Mile Creek – staircase

The extra-large staircase structure is scheduled for repairs/replacement.

Completed work

Glen Oak Creek Trail

The wooden pedestrian bridge was replaced with a manufactured steel bridge.

Indian Ridge Trail

The double culverts were replaced with a manufactured steel bridge.

McCraney Valley Park

The culvert was replaced with a manufactured steel pedestrian bridge.

Petro-Canada Park

The wooden boardwalk was replaced with a new one. A retaining wall was added to address an erosion issue as well as landscape treatment at the adjacent hill. 


Fisherman’s Wharf

The wooden boardwalk was replaced with a wider boardwalk. 

Iroquois Shoreline Woodlot

The small wooden pedestrian bridge was replaced with a new one.

Morrison Valley South

The stair structure was replaced with a new one.

Pondview Place

The wooden elevated boardwalk was replaced with a new one.

Sixteen Mile Creek – boardwalk

The boardwalk was replaced with a new one. The scope of work may also include creek realignment.

Consultant/contractor

Moon-Matz Limited has been retained for design work and contract administration.

  • Phase 1 construction: Awarded to Hawkins Construction - fully completed
  • Phase 2 construction: Awarded to R&M Construction - fully completed
  • Phase 3: To be tendered at the end of March/early April 2025.